|
|
|
|
 |
   |
 |
|
|
 |
 |
 |
|
|
 |
| After the surface material and soil has been removed, we then apply base material and grade
for natural runoff of surface water. During this process, the base material is compacted utilizing
plate vibrators to achieve a firm base for the pave stone field.
|
|
|
 |
|
|
|