|
|
|
|
 |
   |
 |
|
|
 |
 |
 |
|
|
 |
| The pave stone field having been set just beyond the borders is then marked by the installation
crew and the border stone and field stone are then cut to achieve the desired border detail.
These cuts are accomplished with a diamond tip wet saw so that the field stones and border stones
are perfectly aligned. At this point we will excavate the base and sand material within the border
dimensions requiring sub-grade concrete edge restraints and prepare the border stones and field stones adjoining the border stones for the sub grade concrete edge restraint.
|
|
|
 |
|
|
|